First in Europe: in the tidal port of Oostende mega turbines (400 tonnes) are unloaded on wheels

First in Europe: in the tidal port of Oostende mega turbines (400 tonnes) are unloaded on wheels On March 23th 2018 the largest and heaviest wind turbine of Siemens was unloaded at the Port of Oostende by roll-on-roll-off on a specially designed loading and unloading pontoon. After the first parts of the Rentel Windfarm arrived at the REBO terminal in Port of Ostend in mid-February, the technical team had to pull off a difficult feat. The heaviest part of the Siemens 7 MW turbine, the nacelle (20 m long, 9 m wide, 7 m deep, 400 tonnes), arrived 22 March from Cuxhaven (Germany) at the Port of...

Read more

Subscribe to RSS - rentel windfarm